Use 15W-40 oil to lubricate the shaft, the gears, and the bushings. Make sure to lubricate the area between the driven gear and the body.
Install the driven gear onto the shaft.
Install a new gasket on the pump body and install the cover.
Install the capscrews and tighten.
Check the gears for freedom of rotation in the pump.
Install the lubricating oil pressure regulator. Refer to Procedure 007-029 in Section 7.
Install the power steering pump mounting flange gasket and cover. Tighten the capscrews.
Install a new gasket onto the mounting trunion of the lubricating oil pump.
Install the lubricating oil pump into the mounting hole in the cylinder block gear flange.
Install the five mounting capscrews. Tighten the capscrews.
Install the demand flow cooling signal line. Tighten the signal line fittings.